Difference between revisions of "Start Up"
From OPS enCYClopedia
(→=Inject Beam) |
|||
| (One intermediate revision by the same user not shown) | |||
| Line 9: | Line 9: | ||
*Safety Approval/BPR | *Safety Approval/BPR | ||
==System Checks== | ==System Checks== | ||
| − | *Water Systems | + | *[[Water Systems]] |
*Main Magnet | *Main Magnet | ||
*RF | *RF | ||
| Line 30: | Line 30: | ||
*Cyclotron | *Cyclotron | ||
*Extraction | *Extraction | ||
| − | |||
| − | |||
Latest revision as of 07:57, 2 November 2017
Guidelines for starting up the cyclotron.
Administrative Checks
- Work Permits
- Defeats
- Messages
- XScan
- 0E
- Safety Approval/BPR
System Checks
- Water Systems
- Main Magnet
- RF
- Vacuum
- Tank
- ISIS
- Beamlines
- Source
- ISBL
- Correction Plates/Inflector
- Trim Coils
- Harmonic Coils
- Extraction Probes
- Beamline Elements
- Targets
Inject Beam
- Faraday Cup
- Fast Target
- Cyclotron
- Extraction