Start Up

From OPS enCYClopedia
Revision as of 07:57, 2 November 2017 by Kevinmcl (talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Guidelines for starting up the cyclotron.

Administrative Checks

  • Work Permits
  • Defeats
  • Messages
    • XScan
    • 0E
  • Safety Approval/BPR

System Checks

  • Water Systems
  • Main Magnet
  • RF
  • Vacuum
    • Tank
    • ISIS
    • Beamlines
  • Source
  • ISBL
  • Correction Plates/Inflector
  • Trim Coils
  • Harmonic Coils
  • Extraction Probes
  • Beamline Elements
  • Targets

Inject Beam

  • Faraday Cup
  • Fast Target
  • Cyclotron
  • Extraction